On 25 January 2018, the Minister for Planning announced the gazettal of Amendment C187, which introduced a Municipal Development Contributions Plan (PDF 2.1 MB) and added Schedule 2 to the Development Contributions Plan Overlay (DCPO2) into the Brimbank Planning Scheme.
The Municipal DCP applies to all new development in Brimbank, except the Sunshine Town Centre, which has a separate Sunshine Town Centre Development Contributions Plan (PDF 24.5 MB).
The Municipal DCP ensures the cost of providing new infrastructure is shared between developers and the wider community on a fair and reasonable basis.
The levy applies to:
- all new residential
- commercial
- retail
- industrial development
Certain types of developments (e.g. renovations, alterations, demolition and construction of a replacement building, outbuildings, reinstatement of a damaged building) are exempt from paying the levy.
Exemptions are listed in our Municipal DCP FAQ sheet (PDF 697 KB).
The Municipal DCP charges are found in Development Contributions Plan Overlay Schedule 2 (DCPO2) of the Brimbank Planning Scheme.
The levy will increase annually on 1 July to reflect inflation by applying the Consumer Price Index (CPI).
- Use our DCP Levy Calculator below for an approximate levy amount.
- Just want an invoice to pay your levy? Use our Development contributions plan levy invoice request.
Relevant Documents
- Municipal DCP FAQ sheet (PDF 697 KB)
- Sunshine Town Centre DCP FAQ sheet (PDF 1.1 MB)
- Municipal Development Contributions Plan (PDF 2.1 MB)
- Sunshine Town Centre Development Contributions Plan (PDF 24.5 MB)
For any further enquiries, please contact the Development Contributions Plan (DCP) Officer on 03 9249 4000 or DCPofficer@brimbank.vic.gov.au.
